City of Pontiac Martin Luther King Boulevard Reconstruction (4R)

NFE provided the City of Pontiac with preliminary engineering and construction engineering services for the administration of this 1.10-mile road reconstruction project from M-59 to Elm Street. Through this project, a deteriorated and under-capacity three-lane road was reconstructed and widened to five lanes of new concrete pavement. The project also included new storm sewer, concrete sidewalk and non-motorized facility, LED street lights and box-span traffic signals.

NFE provided preliminary engineering services including: preparation of the environmental assessment, including the evaluation of several alternatives for approval by the Michigan Department of Transportation (MDOT) and Federal Highway Administration; preparation of right-of-way plans and administration of the right-of-way acquisition phase; topographic survey; and preparation of roadway construction plans, specifications, special provisions, and plan details in accordance with current MDOT and Federal Highway Administration requirements.

NFE also provided construction engineering services including: contract administration, construction engineering supervision, construction/technical observation (inspection), construction layout and construction staking, on-site quality control and material testing, preparation of pay estimates, preparation and evaluation of punch list work, final inspection, review of documentation for final payment, and recommendation for final acceptance of project in accordance with Michigan Department of Transportation (MDOT) and Federal Highway Administration guidelines and requirements using Field Book and Field Manager software.

Related Projects

Scroll to Top